Colour-Coded Markups - The Simple Tool That Keeps Waterproofing on Track

On a busy site, clarity is everything. A well-structured, colour-coded markup can turn a messy set of plans into a clear roadmap for scheduling, claims, and coordination.

9/15/2025

In the fast-paced world of waterproofing, small details often make the biggest difference. One of the most overlooked tools for project success is the humble colour-coded markup.

On site, it’s not unusual for teams to juggle multiple membrane systems, tricky detailing, and overlapping trades. Without clear visual guidance, confusion creeps in - delays happen, claims get challenged, and productivity drops.

From a QS perspective, colour-coded markups are more than just drawings with notes. They are a communication tool that bridges office planning with site execution. For example:

  • Scheduling made simple: Different colours show different system and scope of works, so installers know what to tackle first.

  • Claiming with confidence: Completed work is clearly visible and defensible in progress claims.

  • Smooth coordination: Builders, architects, and subcontractors can all see what’s done, what’s next, and who’s responsible.

When every trade is looking at the same page - disputes are reduced, and jobs stay on track.

At AQUOSYNC, our takeoffs don’t stop at numbers - our colour-coded markups give your team the clarity they need to deliver faster, safer, and with fewer headaches.
Get in touch to see how we can simplify your next waterproofing project.